How Long Does a Bathroom Remodel Take​?

How long does a bathroom remodel take​

The old porcelain room will be your own personal retreat, tailor-made specifically for you. For most homeowners in Chicago, the thought of remodeling their bathroom brings a mix of exhilaration and anxiety. 

Still, most people ask the same question before starting: how long does a bathroom remodel take? In most cases, a bathroom remodel takes 3 to 8 weeks from demolition to final finishes. A small pull-and-replace bathroom may be done in just three weeks, while a custom master bath with tile, new plumbing, and design changes may take two months or more.

Let’s break down the process step by step so you know what to expect.

Pre-Construction Chicago Bathroom Remodeling Planning

Before any demolition begins, there’s a planning stage. This includes:

  • Creating a design plan
  • Choosing materials and finishes
  • Setting a budget
  • Hiring a contractor or deciding on a DIY approach
  • Getting permits

This stage can take anywhere from 2 to 8 weeks, depending on how fast you make decisions and how quickly permits are approved. In busy cities like Chicago, bathroom remodeling often requires waiting for permit clearance, which can extend this phase.

However, many customers in Chicago report that they often see delays in the completion of remodeling projects. It can be due to various reasons, such as

  • material backorders, 
  • inspector scheduling, or contractor availability, 
  • Last-minute change in design
  • Allow for extra time to meet your expectations.

So when considering the average timeline of bathroom remodeling or plumbing projects, you must give a slight edge for delays as well. 

Typical 4-Week Bathroom Remodel Timeline

Every remodel is different, but here’s a standard four-week timeline to give you a sense of how long things may take.

Week 1: Preparation and Demolition

  • Pre-construction meeting (1 day): Contractors explain the plan and set expectations.
  • Jobsite protection (1 day): Floors and hallways are covered to prevent damage.
  • Demolition (1 day): Old fixtures, tile, and drywall are removed.
  • Rough-in (2–3 days): Bathroom plumbing contractors and electricians install pipes and wiring.
  • First inspection (1 day): Inspectors check the work before walls are closed.

By the end of week one, you’ll see your bathroom stripped down to the studs.

Week 2: Carpentry and Prep

  • Subfloor leveling (2–3 days): Crucial for proper tile installation.
  • Drywall repair (1–2 days): New walls go up where needed.
  • Shower pan install & inspection (1 day): Waterproofing is tested.

At this stage, the room still looks bare, but the foundation for finishes is set.

Week 3: Tile and Major Finishes

Tile work often takes the most time. Floors may take 1–2 days, but a custom shower with mosaics could take a full week. Grout and sealing follow. If you’re going with stone or custom designs, expect this stage to stretch into week four.

Week 4: Final Touches

  • Plumbing finishes (1 day): Bathroom plumbers install faucets, showerheads, sinks, and toilets.
  • Electrical finishes (1 day): Lights, outlets, and switches are connected.
  • Vanity installation (1 day): Cabinets, mirrors, and countertops are set.
  • Painting and trim (1–2 days): Final polish before walkthrough.
  • Final inspection and punch list (1–2 days): Small fixes are made before the project closes.

By the end of week four (or five), your bathroom is ready for daily use. Here, most people also worry about bathroom remodel cost​ in Chicago and the surrounding areas. The cost fluctuates depending on multiple factors, including the scope of your remodeling, bathroom size, and the type of remodeling you want to do. 

Average Bathroom Remodel Duration

  • Small bathroom or half bath: 3–4 weeks
  • Standard bathroom remodel: 4–6 weeks
  • Large custom master bath: 6–8+ weeks

If you’re simply replacing fixtures without moving walls or plumbing, the process will be much shorter. But if your Bathroom Remodel involves changing the layout, moving pipes, or upgrading electrical systems, it will take longer.

Factors That Affect Bathroom Remodel Timelines

  1. Scope of Work: The bigger the remodel, the longer it takes. A simple flooring change is quick, but a full plumbing remodel adds weeks.
  2. Condition of Existing Bathroom: Water damage, mold, or outdated wiring can add unexpected time. A plumber may need to replace corroded pipes before work can continue.
  3. Contractor vs DIY: Doing the work yourself may save money, but it usually takes longer. Professional plumbing contractors and remodelers complete projects faster because they have teams and tools ready.
  4. Custom Features: Custom tile, imported fixtures, or specialty vanities take longer to order and install. If you want a spa-like retreat, add extra time.
  5. Permits and Inspections: Cities like Chicago require permits for plumbing and remodeling projects. Waiting for approval or scheduling inspections can add days or even weeks.

Tips for Staying on Schedule

  • Hire local pros: Search “Chicago bathroom remodeling” or “bathroom plumber near me” to find contractors familiar with local codes.
  • Order materials early: Don’t let your project stall because your tile or vanity hasn’t arrived.
  • Communicate often: Stay in touch with your project manager to resolve small issues before they cause delays.
  • Expect surprises: A Plumber is the Best Choice for Bathroom Remodeling because they spend an extra week or two for safety.

The Bottom Line

The process of Chicago bathroom remodeling will end up having a spick and span place that is made exactly to your liking. Whether you like pink tiles with black grout or want to have an extended island, you can have it. Just remember it will take 3-8 weeks on average and can be extended due to some internal or external reasons. Having flexibility will help you get the results you were hoping for. 

Looking for a reputable name for bathroom remodeling? Contact Baethke Plumbing and let us handle all the heavy lifting for you. We have done hundreds of bathroom and kitchen remodeling projects in Chicago, where our expertise shines. Call us now, and our Plumbers in Chicago will help you get a tailored solution that is both trendy and not heavy on your pocket.

Call (312) 548-8712 or book online! We are 24/7 available for your assistance!

(FAQs) Frequently Asked Questions

Can I use my bathroom during the remodel?

Most of the time, you cannot use the bathroom while it is being remodeled. Contractors usually shut off water and remove fixtures. If you have another bathroom, you’ll need to use that until the remodel is complete.

Do bathroom remodels always need permits?

Yes, in most cities you need permits for plumbing, electrical, or structural work. Even small jobs like moving a toilet may require approval. Your bathroom plumber or remodeling contractor will usually handle the paperwork.

What is the busiest stage of a bathroom remodel?

The tiling stage often takes the most time. Installing floor tile, shower tile, and grout is slow, detailed work. If you choose custom tile, this stage can add days or even weeks.

How do delays usually happen in a remodel?

Delays often come from late material deliveries, waiting on inspectors, or hidden issues like mold or old plumbing. Ordering materials early and hiring reliable bathroom plumbing contractors can help avoid setbacks.

Does a bathroom remodel add value to my home?

Yes. Bathroom remodels usually bring a good return on investment. A new bathroom makes the home more comfortable and more appealing to buyers. Even a small upgrade can increase your home’s value.

Schedule an Appointment

Don’t let your plumbing problem turn into a nightmare. Schedule an Appointment by completing our online form now!

5.0 out of 5

Out of 249 Reviews

250,000
Jobs handled since 1993
100%
Family owned & operated

How Long Does a Bathroom Remodel Take​?

Our Products and Services Come With a Worry-Free Guarantee

Share